Kingswood Homes Custom Residence - Estes Park, CO
May 31, 2006
Loft walls going up; Stairway to loft being built.
May 30, 2006
Loft sub-floor completed; preparing for loft walls;
Remaining rear wall sheathing and additional house-wrap installed.
May 25, 2006
4pm - Final main level exterior wall up;
preparing for loft floor joists.
May 24, 2006
5pm - Additional south/front walls up; Some basement wall framing.
May 19, 2006
3:30 pm - The west main-level exterior wall is up.
May 19, 2006
2pm - Main level interior walls going up;
2nd floor joists arrived
May 18, 2006
Main level walls going up.
1pm
3pm
May 17, 2006
Backfill and grading around house almost finished.
1pm
May 16, 2006
Backfill around house continues.
4pm
May 15, 2006
Backfill around house underway. Path made around east side of house.
10am
3pm. Large excavator in rear of house. Soil
compaction in rear.
May 12, 2006 4pm
Main floor walls being prepared; Exterior sheathing placed on basement walls.
May 11, 2006 5pm
Main level sub-floor completed.
The view from the main level (wow!)
Lower view out the rear of the main floor (patio area).
May 10, 2006 4pm
Main level floor joists almost complete;
Main floor sub-floor being installed.
May 9, 2006 4pm
Basement framing continues.
May 8, 2006 5pm
Basement framing continues.
May 5, 2006 5pm
Basement framing.
May 4, 2006 2pm
Framing begins
May 3, 2006 11am and 1pm
Slab pour.
May 3, 2006 10am
Slab pour prep.
May 2, 2006 1pm
Wire for slab arrived; Holes dug for thick concrete post beams.
May 1, 2006 3pm
Underground plumbing complete and covered, ready for the slab.