Kingswood Homes Custom Residence - Estes Park, CO


July 31, 2006
Garage drywall tape and floating completed; Continued drywall hanging in the main level;
Loft drywal hanging began; Additional front siding installed.









Loft Started







July 29, 2006
The homeowners working at their home on the weekend.






July 28, 2006
Drywall hanging continues, basement and the garage is complete, now working on main level;
Front porch roof structure continues and front right siding; Main level front door installed.













July 27, 2006 2pm
Drywall hanging continues, most of the basement and the garage is complete;
Front porch roof structure started.





Basement north/east corner



July 26, 2006
Drywall started in basement/garage; garage doors installed; additional sheetrock stocked.















July 25, 2006
Front siding completed on left side of home; sheetrock arrived.







July 24, 2006
Roof shingles installed; additional soffit and siding installed;
insulation and roofing inspections passed; additional front porch framing.








July 22, 2006
Rosin paper installed on floors, ready for sheetrock.






July 21, 2006
Front soffit and fascia continues; Front siding started;
Insulation completed; Roof shingles ready to be installed.











July 20, 2006
Front soffit and fascia being installed; Framing inspection passed, ready for insulation; final electrical components readied.









July 19, 2006
Almost all remaining windows installed; items completed for framing inspection.







July 17, 2006
Plumbers completed wall rough-in; front deck build continued.








July 14, 2006
Garage door trim installed; front deck started; electrical rough-in inspection passed;
garage furnace vent installed; final furnace ducts installed; final shower enclosure installed.









July 13, 2006
Additional framing in basement/garage; numerous windows installed in the great room; gas lines installation completed;
electrical rough-in completed; trim started in front exterior.







July 12, 2006
Framing in basement/garage; stairs from garage to house; gas lines being installed;
electrical rough-in continues, almost complete; Low-voltage wiring rough-in completed.











July 11, 2006
Log siding nearly complete on east side; all east side windows installed;
electrical rough-in continues; low-voltage wiring rough-in continues.









A long-time resident watching the progress.




July 10, 2006
Log siding started on east side; additional windows installed on east side;
electrical rough-in continues; low-voltage wiring rough-in started (telephone, cable, etc).








July 07, 2006
Log siding completed on the west side; electrical rough-in continues; west deck framing continues.







West Side



July 06, 2006
Log siding going up on the west side; electrical rough-in continues; west exterior door installed; additional west deck framing.









July 05, 2006
Additional basement and garage framing; electrical rough-in began; water supply line pressure test.








Garage ceiling soffit



July 03, 2006
Additional log siding installed; west deck area being started; knee-wall near entry built; additional plumbing.











July 01, 2006
Rear log siding, soffit, trim, and fascia continues, rear siding
almost complete; Plumbing piping continues.