Kingswood Homes Custom Residence - Estes Park, CO
March 31, 2006 2pm
Final days of staining and painting; Some minor trim installed this week.
March 29, 2006 8am
Kitchen countertop installed.
March 26, 2006 8am
Door, window, and baseboard trim completed;
Next will be staining of the interior doors and a few
other trim pieces.
March 25, 2006 2pm
Most door, window, and baseboard trim completed; Ceramic tile and
vinyl completed.
(Ceramic tile not wiped clean yet)
March 23, 2006 3pm
Guest Bathroom floor
Pellet stove tile with grout
Entry tile ready for grout
March 23, 2006 10am
Interior doors installed. Started on other trim.
Remainder of ceramic tile and vinyl installation underway.
Window sill trim completed and being stained.
March 22, 2006 9am
Ceramic tile installation underway. Window sill trim being installed.
Master bathroom vanity
Utlity room cabinet
Window sill in master bedroom
March 20, 2006 2pm
Cabinet installation underway.
Floors being prepped for ceramic tile and vinyl.
Door into garage
March 17, 2006 8am
Main level wall and ceiling painting completed.
Most trim boards stained.
March 16, 2006 10am
Exterior stone work continued-affixing mesh to outside walls.
Continued painting.
Wire mesh where the stone will go.
An upper kitchen cabinet, with a sample of the door and baseboard trim in the middle
March 15, 2006 10am
Drywall texture applied March 13.
Primer applied to main level walls and ceilings March 15.
Cabinets arrived.
Exterior stone work started.
Homeowners and Mike Kingswood below
March 11, 2006 8am
Drywall ready for texture. Gas meter installed. Boiler fired.
March 08, 2006 8am
Drywall taping and floating continues.
Gas pipe relocated, ready for the meter.
March 06, 2006 noon
Drywall taping and floating underway.
Pellet stove vent in ceiling set
March 03, 2006 9am
Drywall hanging completed.
March 01, 2006 2pm
Drywall hanging in the basement is nearly complete.
Work has started on the main level.