Kingswood Homes - Custom Home - Estes Park, CO


October 24, 2007

Slab concrete poured.








October 23, 2007

Slab area preparation; rough plumbing almost completed; slab next.














October 18, 2007

Slab area preparation; rough plumbing started; driveway moved.
















October 17, 2007 PM

Damp-proofing on concrete walls; radon pipes; foundation drain pipes; frost-wall insulation; slab prep.












October 17, 2007 AM

All concrete walls poured and stripped; Slab preparation next.

















October 9, 2007

Footer concrete installed; forms for concrete walls being installed.








October 3, 2007

Almost ready for the footer concrete.