Kingswood Homes Custom Home
Day 184, Wednesday, October 5, 2005
Passed insulation inspection;
Additional east wall cedar siding and soffit (almost finished with that wall);
Drywall arrived and hanging started;
All remaining windows arrived (installed the upper loft windows).
Basement sheetrock started.
Final pictures of the wiring cabinet in the study.
(Cable TV, ethernet, and telephone wiring)
Upper loft windows installed
Sheetrock started in the utility room
Day 183, Tuesday, October 4, 2005
Insulation completed
(R-38 ceilings, R-19 walls, R-30 Garage ceiling);
Roofing shingles completed;
Passed mid-roof inspection;
Additional east wall cedar siding and soffit;
Additional electrical work for cable and ethernet wiring.
A bit too dark outside for roofing and siding pictures today.
Day 182, Monday, October 3, 2005
Additional east wall cedar siding and soffit;
Additional electrical work for cable and ethernet wiring;
Insulation started;
Day 179, Friday, September 30, 2005
Completed rear cedar siding and soffit; Passed framing inspection.
Additional electrical work for cable and ethernet wiring.
Roof shingles delivered. Insulation due Monday Oct 3.
Day 177, Wednesday, September 28, 2005
Additional rear cedar siding and soffit; Passed rough wiring inspection.
Additional electrical work for cable and ethernet wiring.
Loft stairwell wall installed.
Cabinets arrived (in boxes, in the basement).
Framing inspection tomorrow. Insulation next week.
Day 175, Monday, September 26, 2005
Additional rear cedar siding; Windows for loft bedrooms installed.
Additional electrical work.
Gas meter installed.
Day 172, Thursday, September 22, 2005
Rear door overhang complete; Additional rear cedar siding;
More electrical work.
Day 171, Thursday, September 22, 2005
Plumbing Rough-in complete; Furnace rough-in complete; Rear door overhang almost complete;
More electrical work.
Day 170, Wednesday, September 21, 2005
Radon pipes installed; Almost completed rear door overhang;
Passed rough plumbing inspection; A bit more rear siding.
Day 169, Tuesday, September 20, 2005
Final deck stair framing; Additional rear door overhang work;
Gas lines installed inside(yellow pipe); Electrical wiring continued.
Day 168, Monday, September 19, 2005
Main deck stair framing almost complete; Rear door overhang started;
Furnance installed; Almost finished with plumbing; Electrical wiring
work started.
Rear Door overhang
electrical work started
Fold-down attic ladder installed
Vent pipes in attic
Lennox furnance in basement
Day 166, Saturday, September 17, 2005
Natural gas line dug. Work on deck stairs.
About 36" deep Trench
Day 165, Friday, September 16, 2005
Final smaller deck beams installed; Additional siding on garage side;
All copper plumbing lines complete. Additional furnance vents installed.
Some work on rear deck.
Day 164, Thursday, September 15, 2005
Deck beams installed; Remainder of exterior doors installed; Remainder
of main floor and basement windows installed; Additional siding on garage side; More plumbing lines.
Main entry door
Day 163, Wednesday, September 14, 2005
Additional siding in rear and garage side, more plumbing lines,loft shower installed,
master bathroom shower pan installed,
additional deck framing, more furnace pipes installed,
more front windows installed, final interior beam, in loft, installed.
Loft Beam (in center)
Loft tub
Master Bathroom shower pan
Day 162, Tuesday, September 13, 2005
Additional siding (1 side finished, now working
on the rear), more plumbing lines, additional deck framing, more furnace pipes installed,
rear door installed and bathroom glass block window.
Rear of house
Day 161, Monday, September 12, 2005
Additional plumbing lines, deck framing, and furnace pipes installed.
Day 158, Friday, September 9, 2005
Additional siding installed. Garage doors finished. More decking and rough plumbing.
Day 157, Thursday, September 8, 2005
Additional siding installed. Garage doors installed. Furnace rough-in started. More rough plumbing.
Day 156, Wednesday, September 7, 2005
Siding started and multiple windows installed. The initial decking began and more rough plumbing.
Furnace staff start tomorrow and well as the garage door should be installed.
Day 155, Tuesday, September 6, 2005
Rough plumbing started. Finished pocket doors and general backing/blocking.
Garage door area prepped for doors to arrive this week.