May 30, 2008
Concrete sidewalk forms underway, final hardwood coating installed;
new chimney cap; final interior painting/trim.
May 28, 2008
Carpet finished, ready for hardwood final coating.
Master Bedroom and closet
Upstairs bedrooms
May 27, 2008
Painting, carpet, grading, and plumbing trim.
May 26, 2008
Painting and trim.
May 22 2008
Painting, plumbing, and trim.
May 21, 2008
Staining, trim, telephone.
May 20, 2008
Staining, trim, electrical, site and sidewalk prep.
Groove cut into stone
Membrane installed in groove, sealed with tar
Perforated drain pipe in front of membrane
Covered with gravel
Gutter drain pipe
May 17, 2008
Staining, trim, and sidewalk prep.
May 17, 2008
Plumbing and sidewalk prep.
May 16, 2008 PM
Staining, plumbing, microwave, sidewalk prep, and airbits.
May 16, 2008 AM
Knobs and staining
May 15, 2008 PM
Electrical, knobs and staining
May 14, 2008 PM
Trim and staining
May 13, 2008 PM
Trim, tile, and staining
Master closest
May 13, 2008
Trim, tile, and staining
May 12, 2008
Trim, solar, and staining
May 11, 2008
Trim, basement stairs, and staining
May 9, 2008
Trim, basement stairs, and staining
May 8, 2008
Trim, stairs, and staining
2nd floor landing area
New heating units on-site
May 7, 2008
Trim and staining
Attic hatch
Storage room counter
Solar controls
May 6, 2008
Trim
Kitchen desk
Old cabinet in storage room
Handrails/posts underway
Toe Kick
May 5, 2008
Wood floor, Kitchen area trim
May 2, 2008
Final cabinets installed; trim; 1st wood floor poly coating
May 1, 2008
Trim, lights, wood floor filler and sealer
Wood filler applied, then sanded