Kingswood Homes Custom Residence - Estes Park, CO


May 30, 2006
Most cabinets installed; Interior trim and door staining continues;
Interior door trim installation began; Bathroom floor tile preparation underway; Most decking installed.








May 19, 2006 2pm
Interior doors almost all installed; Trim sanding and staining continues;
Closet shelves arrived; Cabinets prepared for installation; Basement received 2nd coat of paint.








May 18, 2006 3pm
Interior doors continues, working on main floor; Trim staining underway.






May 18, 2006 Noon
Interior doors going up, most of the loft doors hung; Stucco ending, scaffolding being removed.










May 17, 2006 1pm
Installation of interior doors began; Trim and cabinets arrived; Stucco almost completed.














May 16, 2006
Final paint coat on main and loft floor completed;
Stucco continues. Most of east side completed, also working on north side
Interior doors arrived.












May 15, 2006
Interior priming on basement completed - 10am.



Exterior stucco continues



Stucco color agent


Most of west and front stucco complete - 3pm




Half of east side stucco complete


First coat of interior final color completed on loft and main floors.
Appears a bit dark as most windows are covered.







May 14, 2006
Interior priming on main and loft floors completed.






May 13, 2006
Drywall texture completed.






May 12, 2006
Interior drywall finished; Texture underway;
Stucco base coat being applied as well as the final coat/color in west-upper, front-west upper, and chimney areas.


(The finish color is exactly the same as the sample obtained)










May 11, 2006
Interior drywall finishing 98% complete;
Stucco base coat being applied (not the final coat/color)








May 10, 2006
Interior drywall finishing 85% complete; Stucco preparation continues.





Trim banding installed - some windows covered